Name of the project Category Agency Name Project Percentage Status
Construction of 3 cell box culvert at Banglar Jhar, Aamtoli road, domohanii-2
Culvert,,,, MITRA ENTERPRISE 70 % Done On Going
Improvement of Bituminious Road with protection wall from opposite Kadamtala
ROAD,,,, D.K. ROY & CO 100 % Done On Going
Construction of Central Hostel for S.T Girls at Parimal Mitra Smriti Mahavidy
BUILDING,,,, M/S DILIP KR DAS & CO 90 % Done On Going
Construction of Central Hostel for S.T. Girls at Parimal Mitra Smriti Mahavid
INTERNAL ELECTRIFICATION,,,, M/S DAWN ELECTRICAL INDUSTRIES 100 % Done On Going
Immolation New 100 Pcs. Pathabati and Renovation at 250 Mtr Road of Batashago
ROAD,,,, HARKUMAR BARMAN 100 % Done On Going
Market Complex with Rehabilitation Component and Haat at Lataguri, District J
BUILDING,,,, M P SITANI AND SONS 65 % Done On Going
Construction of Water Supply Scheme at Meenglas T.E. (Munchi Line, Risish Lin
WATER SUPPLY,,,, M/s Sakar Enterprise 40 % Done On Going
Construction of Road and Protection work, Beautification and Road Side Drain
ROAD,,,, NORTH BENGAL CO-OP LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED 100 % Done On Going
Construction of R.C.C. Bridge Over River Neora Including Approach Road on Bot
BRIDGE,,,, SAHARA CONSTRUCTION 30 % Done On Going
Construction of Water Supply Scheme at Kumlai T.E. (Godhuria & Bhuglu Line) u
WATER SUPPLY,,,, PARTHA BISWAS AND COMPANY 100 % Done On Going
Construction of Connecting Road from NH31 to Old PWD Road Near City Centre, M
ROAD,,,, THE MAHADEV CONSTRUCTION 100 % Done On Going
Construction of Pucca Road with Drain from IOC Pipeline to HO Sanjiban Sarkar
Development Work,,,, MAA TARA LABOUR CO-OPERATIVE CONTRACT AND CONSTRUCTION SOC LTD 40 % Done On Going
Strengthening of Road at Ward No. 02 under Jalpaiguri Municipality, Jalpaigur
ROAD,,,, DELICATE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 70 % Done On Going
Construction of Boundary Wall for Proposed Commerce College at Kawakhali New
BOUNDARY WALL,,,, M/S B M CONSTRUCTION 50 % Done On Going
Construction of Bridge (Two Cell Box Culvert) connecting Telipara to Ashighar
ROAD,,,, BIMAN CHAKRABORTY 80 % Done On Going
Improvement of Bituminious Road with protection Wall from Jeevan Prakash Medi
ROAD,,,, NORTH BENGAL CO-OP LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED 80 % Done On Going
Development of Field and Construction of Drain at Kaliganj Girls Jr. High Sch
Development Work,,,, HARKUMAR BARMAN 85 % Done On Going
Providing Electrical Infrastructure such as UPS at RT-PCR Lab (VDRL) And Copp
Electrical,,,, Multifix 100 % Done On Going
Construction of Boundary Wall for SJDA Land Opposite of Uttarayan (15 acre ap
BOUNDARY WALL,,,, M/S SUBRATA GHOSH AND CO 55 % Done On Going
Estimate for Construction of Pucca Road with Drain from IOC Pipeline to H/O S
ROAD,,,, Mars Lab. Cont & Const. Coop Soc Ltd. 65 % Done On Going
Providing Solar Street Lights in the approach road of Jalpesh Mandir, Dist.:
Electrical,,,, M/S Prakash Enterprise 100 % Done On Going
Installation of 140 nos. LED Street Lights of 70 W and 390 nos. of LED Street
STREET LIGHT,,,, M/S SANJAY ELECTRIC WORKS 100 % Done On Going
Construction of Bituminous Road & Paver Block Road and both side Drain from
ROAD,,,, M/S SURAJIT CONSTRUCTION 50 % Done On Going
Providing Internal Electrification including fans, Fittings, AC Units & Geyse
Development Work,,,, M/S GHOSH ELECTRICALS 95 % Done On Going
Providing luminaries and Electrical Works for water treatment Plant at C.E.O
Electrical,,,, Rajib Paul 100 % Done On Going
Electrification at Auditorium, Office cum Library and Folk Cultural Centre (G
Electrical,,,, M/s Raj Enterprise 100 % Done On Going
Reparing of existing Luminaires and allied systems at Rajbari Dighi, Jalpaigu
Electrical,,,, M/s Raj Enterprise 100 % Done Completed
Providing UPS for CCTV , External HDD and Electrical renovation of Chief Exec
Electrical,,,, Multifix 100 % Done Completed
Construction of Road Starting From Eastern Bypass via Baribhasa Main Road to
ROAD,,,, SMB ENTERPRISE 100 % Done Completed
Segregation of electrical service connection as well as internal wiring in LC
Electrical,,,, M/S Kasturi Enterprise 100 % Done On Going
Construction of Road from Netaji More to H/o Ashok Rai at Kholachand Fafri un
ROAD,,,, Friends Co-Operative Labour Contract and Construction Sty Ltd. 75 % Done On Going
CONSTRUCTION OF BOTH SIDE Drain And Bituminous Road Starting From Rosan More
Development Work,,,,, CHANCHAL CHAUBE 100 % Done Completed
Estimate For Construction Of Both Side Drain And Bituminous Road Starting Fr
Development Work,,,,, CHANCHAL CHAUBE 100 % Done Completed
Additional work (deep tube well, land development, boundary wall etc.) along
Development Work,,,, SUMAN ROY 100 % Done On Going
Area Development of Office cum Guest house of D.M. Darjeeling at Pintel Villa
Development Work,,,, Indrajeet Sengupta 100 % Done Completed
Providing additional poles including fittings and replacement / repairing of
Electrical,,,, M/s Raj Enterprise 100 % Done Completed
providing CCTV Surveillance cameras at Raja Ram mohan Roy road and Rishi auro
Electrical,,,, Multifix 100 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Haripur Nich
Development Work,,,,, ALAM MAHA 100 % Done Completed
Construction of Pucca Road PMGSY to Barapathu Village under Jalas G.P., Dist.
ROAD,,,, M/S MIRA COSTRUCTION 90 % Done On Going
Replacement of Existing Damaged / Old Feeder Pillar and Pole Loop Box and U.G
STREET LIGHT,,,, KRISHNA TRADING CO 90 % Done On Going
Widening & Upgradation of Road from Porajhar Pumping Station towards Railway
ROAD,,,, Suraj Sekh 90 % Done On Going
Providing CCTV Surveillance cameras at Bimal sinha sarani and tilak road at w
Electrical,,,, Multifix 100 % Done On Going
Repairing of Road from Chandan Nagar to Mamata Para Main Road, Bokrivita, Par
ROAD,,,, PARTHA BISWAS AND COMPANY 100 % Done Completed
Renovation of Office cum Guest House of D.M. Darjeeling at Pintail Village, S
BUILDING,,,,, Ghanasham Sarkar 100 % Done Completed
Development Work at Sayedabad Kabarstan at Bidhan Nagar Dist. Darjeeling.
Development Work,,,, M/S ARUN CHANDRA SARKAR & SONS 100 % Done Completed
CONSTRUCTION OF BITUMINOUS ROAD AND DRAIN AT BANKIM CHANDRA ROAD AND HEMANTA
Development Work,,,, Friends Co-Operative Labour Contract and Construction Sty Ltd. 100 % Done Completed
Construction of Culvert at Nagar berubari GP, Jalpaiguri.
Culvert,,,, Narendra Nath das & Co. 100 % Done On Going
Temporary hire and fixing of CC camera with monitor at different location of
CCTV Works,,,, Multifix 100 % Done Completed
Temporary hire and fixing of CC camera with monitor at different Ghats of Sil
CCTV Works,,,, Multifix 100 % Done Approved
Improvement of Road and Drainage system at Composite Complex Phase -I ( Part-
Development Work,,,, JAYANTA GHOSH 100 % Done On Going
Construction of pucca road from Paharpur Uttor Baruapara Co-operative more t
ROAD,,,, BRAJAGOPAL SAHA 100 % Done Completed
Supplying and Installation of 01 (One) No. High Mast at Moulani Haat, P.S.
Electrical,,,, M/s Raj Enterprise 100 % Done On Going
Electrification of Open Stage at Basundhara Abasan.
Electrical,,,, M/S Kasturi Enterprise 0 % Done On Going
Improvement of Bituminious Road from Gandhi Statue to SP banglow via RI Offic
ROAD,,,, Ghanashyam Sarkar 0 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P
Development Work,,,, S. G. CONSTRUCTION 0 % Done On Going
Repairing Road from Gora more to Main canal under Fulbari GP -II, Dist. Ja
ROAD,,,, S. G. CONSTRUCTION 0 % Done On Going
Construction of cement concrete road with Paver block at Janatapara fish mark
ROAD,,,, M/S Prakash Enterprise 0 % Done On Going
Construction of cement concrete road with Paver block at ramnagar colony Mai
ROAD,,,, M/S Prakash Enterprise 0 % Done On Going
Construction of Bituminous Road with Culvert and One side Pucca Drain from Na
ROAD,,,, M/s Rakshit Construction 75 % Done On Going
Boundary Wall at Malgach Kabarstha under Bidhan Nagar G.P.-I, Dist. Darjeelin
BOUNDARY WALL,,,, SWASTIK TRADERS 100 % Done Completed
Beautification near Rathhola Sporting Club at Ward No. 22 under SMC, Siliguri
BEAUTIFICATION,,,, M/S Ghosh & Sarkar Construction 100 % Done On Going
Installation of 01 (one) nos. Mini High Mast at Ranir Haat More, Churabander
Electrical,,,, M/s Raj Enterprise 100 % Done On Going
Construction of Cement Concrete Road Starting Along With Guard Wall At Joytir
ROAD,,,, J. K. Construction 100 % Done On Going
Construction of Auditorium, Office Cum Library and Folk Cultural Center (GF a
BUILDING,,,, BINOY ROY 100 % Done On Going
Construction of road, drain and 6 nos. culvert from the house of Mr. K. P. Da
Road & Drain Work,,,, Santosh Das 100 % Done Completed
Supplying and Installation of 01 (One) No. High Mast at Moulani Haat, P.S.
Electrical,,,, M/s Raj Enterprise 0 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Panchkolguri
Development Work,,,, Fescon 35 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Haripur Nich
ROAD,,,, Fescon 50 % Done On Going
Strengthening of Road from Sani Mandir to Gourio Math via Biswa Bangla Sports
ROAD,,,, M P SITANI AND SONS 0 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P
Development Work,,,, Ghanashyam Sarkar 80 % Done On Going
Construction of road From Payel More to Ektiasal Hut via Iscon Mandir via Pra
ROAD,,,,, M/S Dolphin Construction Co. 100 % Done Completed
Repair of Mastic road starting from HO Kalyan Das to HO Sarathi Das at ward n
ROAD,,,, Uttam Enterprise 0 % Done On Going
Beautification of Krishnamaya School gate at Ward No. 12 under SMC, Siliguri
BEAUTIFICATION,,,, ABHIJIT DAS 100 % Done Completed
Construction of High Drain from Gowala Patty Manager Jadav House to Mahananda
DRAIN,,,, Indrajit Sengupta 0 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P
Development Work,,,, M/S Dolphin Construction Co. 80 % Done On Going
Construction of 3 Cell RCC Box Culvert at Nandanpur, Boalmari(Banskunthia) un
Culvert,,,, JOY LAXMI CONSTRUCTION 0 % Done On Going
Repairing of Road Starting from Garage of Surya Mallik to Bakery via H/o Ujja
ROAD,,,, BIMAN CHAKRABORTY 0 % Done On Going
Construction of Bituminous Road with Drain at Ramnagar Mazdur Basti under Ful
Development Work,,,, R. S. CONSTRUCTION 70 % Done On Going
Construction of Pucca Road with Guard wall starting from Main canal to Masjid
ROAD,,,, The Hindusthan Coop Lab. Cont. & Const. Soc. Ltd. 80 % Done On Going
Construction of High Drain from Dr Malakar Shop to house of N. B. Sarki at Ra
DRAIN,,,, M/S BAPI DAS 100 % Done On Going
Construction of Water Supply Scheme at Rani Khola Line at Rangamati T. E., Ma
WATER SUPPLY,,,, PRASENJIT BASAK 0 % Done On Going
Construction of Drainage with CC Path from the Shop of Majumder Gas Stove Hou
Road & Drain Work,,,, SABHA CONSTRUCTION 100 % Done On Going
Construction of Market Complex (G.F. & F.F. Phase-I) near Jalpesh Temple, May
BUILDING,,,, MAA TARA LAB CO-OP CONST . CO. LTD 0 % Done On Going
Construction of Market Complex ( G.F , F.F , Fish Shop & Toilet Block Phase-2
BUILDING,,,, MAA TARA LABOUR CO-OPERATIVE CONTRACT AND CONSTRUCTION SOC LTD 0 % Done On Going
Construction of Road including Protective Works from Joydeb Paul House to Ani
ROAD,,,, PARTHA BISWAS AND COMPANY 0 % Done On Going
Construction and Strengthening of road from AH-02 to towards Mia Bosti (Nort
ROAD,,,, THE MAHADEV CONSTRUCTION 0 % Done On Going
Restoration of piller of joint Bridge over river Rakti at Fulbari pattern und
Development Work,,,, Debashis Basak 0 % Done Completed
Roof protection work for Shahid Bhagat Singh Market Complex, Sevoke Road, Sil
BUILDING,,,, M/s Sakar Enterprise 0 % Done Completed
Reconstruction Work at part of Fulbari-Ghosh Pukur By Pass ahead from Fulbari
ROAD,,,, SARFORAJ CHAUDHURY 0 % Done Completed
Construction of Road Starting form Naresh More via Chika More to Fokdoibari B
ROAD,,,, SUBRATA GHOSH 0 % Done On Going
Construction of Road Starting form Naresh More via Chika More to Fokdoibari B
ROAD,,,, PARTHA BISWAS AND COMPANY 0 % Done On Going
Beautification near Rathhola Sporting Club at Ward No. 22 under SMC, Siliguri
BEAUTIFICATION,,,, M/S Ghosh & Sarkar Construction 0 % Done On Going
Construction of Bituminous Road with two side Drain & culvert at Panchkolguri
Development Work,,,, S. R. CONSTN. CO 0 % Done On Going
Installation of 01 (one) nos. Mini High Mast at Ranir Haat More, Churabander
Electrical,,,, M/s Raj Enterprise 0 % Done On Going
Construction of road and one side drain from house of Gopal Halder to Majhaba
Road & Drain Work,,,, ACE CONSTRUCTION COMPANY 100 % Done Completed
Construction of Haat Shade for Fish and Meat Shop at Talma Hat, Sadar Block
BUILDING,,,, MAA TARA LAB CO-OP CONST . CO. LTD 0 % Done Completed
Strengthening of Road at Sagina Mahato Road at Ward No. 18, under SMC, Siligu
ROAD,,,, M/S ARUN CHANDRA SARKAR & SONS 100 % Done On Going
Construction of Open Stage With Steel Truss Shade at Jalpesh Mela Ground, Mad
BUILDING,,,, Priya Bhushan Dey 100 % Done Approved
Construction of 4 nos Community Toilet at Paswan Busty, Ward No-43 of SMC, Di
Development Work,,,, SUBRATA GHOSH 0 % Done On Going
Strengthening of Ganganagar Main Road and Mouni Baba Road at Ward No 5, under
ROAD,,,, Santosh Das 100 % Done Approved
Construction of Road, Drainage System with Guard Wall Lanes and Bye Lane at T
Development Work,,,, SUMAN ROY 0 % Done On Going
Construction of Pucca Road From Magura More to Balason River at Bidhan Nagar,
ROAD,,,, SOMDEEP GUHA 0 % Done Completed
Construction of Road and Drain from Netaji Bazar to Jermels Academy School at
Development Work,,,, NITAI SARKAR 0 % Done Completed
Construction of Mastic Road for Mangal Pandey Sarani and 1st, 2nd, 3rd By Lan
ROAD,,,, D G CONSTRUCTION 0 % Done Completed
Construction of Mastic Road of Atul Prasad Sarani and By Lane Dudh More Sani
ROAD,,,, M P SITANI AND SONS 0 % Done Completed
Construction of Road and Drain from Nabin Sangha Club O Pathagar to Mandal Gh
Road & Drain Work,,,, HARKUMAR BARMAN 0 % Done Completed
Auditorium (500 Seat) in the Campus of Ekalavya Model Residential School (EM
BUILDING,,,, M/s Sakar Enterprise 0 % Done On Going
Environment Friendly Nature Park at Lataguri, Dist. Jalpaiguri.
BEAUTIFICATION,,,, GOURI CONSTRUCTION 0 % Done On Going
Construction of G+3 STORIED GUEST HOUSE AT HIMANCHAL VIHAR, PHASE- II, MATIGA
BUILDING,,,, M P SITANI AND SONS 0 % Done On Going
Remaining works of main Institute Building including Sanitary & Plumbin
BUILDING,,,, M/s Nanu Shome & Co. 0 % Done On Going
Settings

Set your own customized style

Color Scheme

Choose the perfect color mode for your app.


RTL Mode

Switch your language direction

RTL Documentation

Fluid Layout

Toggle container layout system

Fluid Documentation

Navigation Position

Select a suitable navigation system for your web application


Vertical Navbar Style

Switch between styles for your vertical navbar

See Documentation

Like What You See?

Get Falcon now and create beautiful dashboards with hundreds of widgets.

Purchase