Recent Activity
Project Name | Nit Niq No | Category | Agency Name | Amount | Project Percentage | Block / Minicipality Name | Status |
---|---|---|---|---|---|---|---|
Improvement of Bituminious Road from Gandhi Statue to SP banglow via RI Offic |
033/2021-22 | ROAD,,,, | Ghanashyam Sarkar | 9201733 | 100 % Done | On Going | |
Construction of Road And Both Side Guard Wall from H/O Rameswar Das To H/O Ma |
013/ENGG/2022-23 OF SJDA | Development Work,,,, | M/S BAPI DAS | 4643917 | 100 % Done | On Going | |
Balance Bituminous Road Work of "Construction of Road Drainage System With Gu |
072/engg/2022-23 of sjda | Road & Drain Work,,,, | NARENDRA NATH DAS AND CO | 4821760 | 65 % Done | On Going | |
Construction of 3 cell box culvert at Banglar Jhar, Aamtoli road, domohanii-2 |
002/2021-22 | Culvert,,,, | MITRA ENTERPRISE | 6245042 | 100 % Done | Mayanaguri | On Going |
Construction and Strengthening of road from AH-02 to towards Mia Bosti (Nort |
106/Engg/2020-2021 | ROAD,,,, | THE MAHADEV CONSTRUCTION | 19378783 | 100 % Done | Rajganj | On Going |
Market Complex with Rehabilitation Component and Haat at Lataguri, District J |
118/2018-19 | BUILDING,,,, | M P SITANI AND SONS | 88216630 | 80 % Done | Mal | On Going |
Construction of R.C.C. Bridge Over River Neora Including Approach Road on Bot |
038/2020-2021 | BRIDGE,,,, | SAHARA CONSTRUCTION | 45247517 | 40 % Done | Mayanaguri | On Going |
Balance Bituminous Road AND Drainage Work of Improvement of Road and Drainage |
071/ENGG/2022-23 OF SJDA | Road & Drain Work,,,, | NARENDRA NATH DAS AND CO | 3439847 | 0 % Done | On Going | |
Improvement of Bituminious Road with protection wall from opposite Kadamtala |
049/2020-2021 | ROAD,,,, | D.K. ROY & CO | 8778129 | 100 % Done | On Going | |
Construction of Central Hostel for S.T Girls at Parimal Mitra Smriti Mahavidy |
127/2018-19 | BUILDING,,,, | M/S DILIP KR DAS & CO | 25869081 | 90 % Done | Mal | On Going |
Construction of Central Hostel for S.T. Girls at Parimal Mitra Smriti Mahavid |
134/Elect/2018-19 | INTERNAL ELECTRIFICATION,,,, | M/S DAWN ELECTRICAL INDUSTRIES | 2794760 | 100 % Done | Mal | On Going |
Immolation New 100 Pcs. Pathabati and Renovation at 250 Mtr Road of Batashago |
026/2021-22 | ROAD,,,, | HARKUMAR BARMAN | 2935465 | 100 % Done | On Going | |
Construction of Road and Protection work, Beautification and Road Side Drain |
025/2021-22 | ROAD,,,, | NORTH BENGAL CO-OP LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED | 3103237 | 100 % Done | On Going | |
Construction of Water Supply Scheme at Kumlai T.E. (Godhuria & Bhuglu Line) u |
045/2020-2021 | WATER SUPPLY,,,, | PARTHA BISWAS AND COMPANY | 4879281 | 100 % Done | Mal | On Going |
Construction of Connecting Road from NH31 to Old PWD Road Near City Centre, M |
071/2019-20 e-1st Call | ROAD,,,, | THE MAHADEV CONSTRUCTION | 17245798 | 100 % Done | Matigara | On Going |
Construction of Pucca Road with Drain from IOC Pipeline to HO Sanjiban Sarkar |
121/Engg/2020-2021 | Development Work,,,, | MAA TARA LABOUR CO-OPERATIVE CONTRACT AND CONSTRUCTION SOC LTD | 7020853 | 40 % Done | Rajganj | On Going |
Strengthening of Road at Ward No. 02 under Jalpaiguri Municipality, Jalpaigur |
031/2021-22 | ROAD,,,, | DELICATE ENGINEERS CO-OPERATIVE SOCIETY LIMITED | 6405315 | 70 % Done | On Going | |
Construction of Boundary Wall for Proposed Commerce College at Kawakhali New |
eNIT-086/Engg/2018-2019 of SJDA | BOUNDARY WALL,,,, | M/S B M CONSTRUCTION | 6026207 | 50 % Done | Matigara | On Going |
Construction of Bridge (Two Cell Box Culvert) connecting Telipara to Ashighar |
052/2020-2021 | ROAD,,,, | BIMAN CHAKRABORTY | 6824480 | 80 % Done | Rajganj | On Going |
Improvement of Bituminious Road with protection Wall from Jeevan Prakash Medi |
024/2021-22 | ROAD,,,, | NORTH BENGAL CO-OP LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED | 4489257 | 80 % Done | On Going | |
Development of Field and Construction of Drain at Kaliganj Girls Jr. High Sch |
034/2021-22 | Development Work,,,, | HARKUMAR BARMAN | 6632628 | 85 % Done | Sadar | On Going |
Providing Electrical Infrastructure such as UPS at RT-PCR Lab (VDRL) And Copp |
eNIT-001/Engg/Elect/2022-23 of SJDA | Electrical,,,, | Multifix | 689955 | 100 % Done | Sadar | On Going |
Construction of Boundary Wall for SJDA Land Opposite of Uttarayan (15 acre ap |
072/2019-20 | BOUNDARY WALL,,,, | M/S SUBRATA GHOSH AND CO | 19405103 | 55 % Done | Matigara | On Going |
Providing Solar Street Lights in the approach road of Jalpesh Mandir, Dist.: |
017/Engg / Elect / 2021-22/ SJDA | Electrical,,,, | M/S Prakash Enterprise | 1457469 | 100 % Done | Mayanaguri | On Going |
Installation of 140 nos. LED Street Lights of 70 W and 390 nos. of LED Street |
033/2020-2021 | STREET LIGHT,,,, | M/S SANJAY ELECTRIC WORKS | 2300977 | 100 % Done | Rajganj | On Going |
Construction of Bituminous Road & Paver Block Road and both side Drain from |
005/2021-22 | ROAD,,,, | M/S SURAJIT CONSTRUCTION | 13265645 | 50 % Done | On Going | |
Providing Internal Electrification including fans, Fittings, AC Units & Geyse |
013/Elect/2021-22 | Development Work,,,, | M/S GHOSH ELECTRICALS | 883733 | 95 % Done | Matigara | On Going |
Providing luminaries and Electrical Works for water treatment Plant at C.E.O |
007/Engg / Elect / 2022- 23 / SJDA | Electrical,,,, | Rajib Paul | 54535 | 100 % Done | On Going | |
Construction of Road including Protective Works from Joydeb Paul House to Ani |
104/Engg/2020-2021 | ROAD,,,, | PARTHA BISWAS AND COMPANY | 17929717 | 83 % Done | Rajganj | On Going |
Construction of CC Road starting from Mazumdar House to Post Office at Ward N |
096/ENGG/2020-2021 | ROAD,,,, | MARS LABOUR CONTRACT & CONSTRUCTION COOPERATIVE SOCIETY LTD. | 2160498 | 100 % Done | On Going | |
Electrification at Auditorium, Office cum Library and Folk Cultural Centre (G |
061/Engg / Elect / 2021-22/ SJDA (2nd Call) | Electrical,,,, | M/s Raj Enterprise | 499704 | 100 % Done | Sadar | On Going |
Reparing of existing Luminaires and allied systems at Rajbari Dighi, Jalpaigu |
044/Engg / Elect / 2021- 22 / SJDA (2nd Call) | Electrical,,,, | M/s Raj Enterprise | 124191 | 100 % Done | Sadar | Completed |
Providing UPS for CCTV , External HDD and Electrical renovation of Chief Exec |
002/Engg / Elect / 2022 - 23/ SJDA | Electrical,,,, | Multifix | 96967 | 100 % Done | Completed | |
Construction of Road Starting From Eastern Bypass via Baribhasa Main Road to |
123/Engg/2020-2021 | ROAD,,,, | SMB ENTERPRISE | 6319424 | 100 % Done | Rajganj | Completed |
Segregation of electrical service connection as well as internal wiring in LC |
004/Engg/Elect/2022-23/SJDA | Electrical,,,, | M/S Kasturi Enterprise | 49067 | 100 % Done | Rajganj | On Going |
Construction of Road from Netaji More to H/o Ashok Rai at Kholachand Fafri un |
119/Engg/2020-2021 | ROAD,,,, | Friends Co-Operative Labour Contract and Construction Sty Ltd. | 15663460 | 100 % Done | Rajganj | On Going |
CONSTRUCTION OF BOTH SIDE Drain And Bituminous Road Starting From Rosan More |
092/Engg/2020-2021 | Development Work,,,,, | CHANCHAL CHAUBE | 7586652 | 100 % Done | Completed | |
Estimate For Construction Of Both Side Drain And Bituminous Road Starting Fr |
093/Engg/2020-2021 | Development Work,,,,, | CHANCHAL CHAUBE | 7509012 | 100 % Done | Completed | |
Additional work (deep tube well, land development, boundary wall etc.) along |
098/2019-20 | Development Work,,,, | SUMAN ROY | 6942407 | 100 % Done | On Going | |
Area Development of Office cum Guest house of D.M. Darjeeling at Pintel Villa |
059/Engg/2021-22 (Offline) | Development Work,,,, | Indrajeet Sengupta | 471389 | 100 % Done | Matigara | Completed |
Providing additional poles including fittings and replacement / repairing of |
051/Engg / Elect / 2021 - 22/ SJDA | Electrical,,,, | M/s Raj Enterprise | 155528 | 100 % Done | Sadar | Completed |
providing CCTV Surveillance cameras at Raja Ram mohan Roy road and Rishi auro |
140/engg/elect/2020-21 | Electrical,,,, | Multifix | 440772 | 100 % Done | On Going | |
Construction of Bituminous Road with two side Drain & culvert at Haripur Nich |
084/Engg/2020-2021 | Development Work,,,,, | ALAM MAHA | 9706506 | 100 % Done | Rajganj | Completed |
Construction of Pucca Road PMGSY to Barapathu Village under Jalas G.P., Dist. |
004/2021-22 | ROAD,,,, | M/S MIRA COSTRUCTION | 9556415 | 90 % Done | Matigara | On Going |
Replacement of Existing Damaged / Old Feeder Pillar and Pole Loop Box and U.G |
042/2019-20 | STREET LIGHT,,,, | KRISHNA TRADING CO | 5198222 | 90 % Done | On Going | |
Widening & Upgradation of Road from Porajhar Pumping Station towards Railway |
107/Engg/2020-2021 | ROAD,,,, | Suraj Sekh | 19409007 | 90 % Done | Rajganj | On Going |
Providing CCTV Surveillance cameras at Bimal sinha sarani and tilak road at w |
139/engg/elect/2020-21 | Electrical,,,, | Multifix | 440772 | 100 % Done | On Going | |
Repairing of Road from Chandan Nagar to Mamata Para Main Road, Bokrivita, Par |
064/2020-2021 | ROAD,,,, | PARTHA BISWAS AND COMPANY | 6993910 | 100 % Done | Rajganj | Completed |
Renovation of Office cum Guest House of D.M. Darjeeling at Pintail Village, S |
014/2021-22 | BUILDING,,,,, | Ghanasham Sarkar | 3229140 | 100 % Done | Matigara | Completed |
Development Work at Sayedabad Kabarstan at Bidhan Nagar Dist. Darjeeling. |
080/2019-20 | Development Work,,,, | M/S ARUN CHANDRA SARKAR & SONS | 2984257 | 100 % Done | Phansidewa | Completed |
CONSTRUCTION OF BITUMINOUS ROAD AND DRAIN AT BANKIM CHANDRA ROAD AND HEMANTA |
097/Engg/2020-2021 | Development Work,,,, | Friends Co-Operative Labour Contract and Construction Sty Ltd. | 2852482 | 100 % Done | Completed | |
Construction of Water Supply Scheme at Manabari T.E. (Manabari Factory Line & |
029/Engg/2022-2023 e-1st Call | WATER SUPPLY,,,, | Ghanashyam Sarkar | 11523649 | 15 % Done | Mal | On Going |
Reparing of Ladies Barrack at Rajganj Police Station, Rajganj |
025/ENGG/2022-2023 | BUILDING,,,, | Multifix | 499151 | 100 % Done | Rajganj | Completed |
Construction of Water Supply Scheme at Meenglas T.E. (Munchi Line, Risish Lin |
044/2020-2021 | WATER SUPPLY,,,, | M/s Sakar Enterprise | 18765414 | 70 % Done | Mal | On Going |
Construction of Boundary Wall at Samsan Ghat at Maynaguri, Dist-Jalpaiguri. |
010/Engg/22-23 of sjda | BOUNDARY WALL,,,,, | SUDIPTA MAHANTA | 5886721 | 0 % Done | Mayanaguri | On Going |
Emergency Repairing at different stretches of Road from IOCL underpass to Eas |
045/ENGG/2022-2023 | ROAD,,,, | J.M. CONSTRUCTION | 1464492 | 0 % Done | Rajganj | On Going |
Construction of Culvert at Nagar berubari GP, Jalpaiguri. |
132/Engg/2020-21 | Culvert,,,, | Narendra Nath das & Co. | 2117372 | 100 % Done | Sadar | On Going |
Temporary hire and fixing of CC camera with monitor at different location of |
EOI/NIQ-002/Engg/Elect/2022-23/SJDA | CCTV Works,,,, | Multifix | 1768090 | 100 % Done | Completed | |
Estimate for Construction of Pucca Road with Drain from IOC Pipeline to H/O S |
122/Engg/2020-2021 | ROAD,,,, | Mars Lab. Cont & Const. Coop Soc Ltd. | 7402400 | 100 % Done | Rajganj | On Going |
Temporary hire and fixing of CC camera with monitor at different Ghats of Sil |
003/Engg/Elect/2022-23/SJDA | CCTV Works,,,, | Multifix | 360591 | 100 % Done | Completed | |
Improvement of Road and Drainage system at Composite Complex Phase -I ( Part- |
078/2019-20 | Development Work,,,, | JAYANTA GHOSH | 8150967 | 100 % Done | On Going | |
Construction of pucca road from Paharpur Uttor Baruapara Co-operative more t |
068/2019-20 | ROAD,,,, | BRAJAGOPAL SAHA | 10700609 | 100 % Done | Sadar | Completed |
Supplying and Installation of 01 (One) No. High Mast at Moulani Haat, P.S. †|
137/Engg / Elect / 2020-21/ SJDA (2nd Call) | Electrical,,,, | M/s Raj Enterprise | 483998 | 100 % Done | Mal | On Going |
Electrification of Open Stage at Basundhara Abasan. |
062/Engg / Elect / 2021- 22 / SJDA | Electrical,,,, | M/S Kasturi Enterprise | 154675 | 0 % Done | On Going | |
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P |
076/ENGG/2020-2021 | Development Work,,,, | S. G. CONSTRUCTION | 8266223 | 0 % Done | Rajganj | On Going |
Repairing Road from Gora more to Main canal under Fulbari GP -II, Dist. Ja |
080/ENGG/2020-2021 | ROAD,,,, | S. G. CONSTRUCTION | 9590056 | 0 % Done | Rajganj | On Going |
Construction of cement concrete road with Paver block at Janatapara fish mark |
110/Engg/2020-2021 | ROAD,,,, | M/S Prakash Enterprise | 5166489 | 0 % Done | On Going | |
Construction of cement concrete road with Paver block at ramnagar colony Mai |
111/Engg/2020-2021 | ROAD,,,, | M/S Prakash Enterprise | 6276680 | 0 % Done | On Going | |
Construction of Bituminous Road with Culvert and One side Pucca Drain from Na |
030/2021-22 | ROAD,,,, | M/s Rakshit Construction | 14344815 | 75 % Done | Rajganj | On Going |
Boundary Wall at Malgach Kabarstha under Bidhan Nagar G.P.-I, Dist. Darjeelin |
048/2019-20 | BOUNDARY WALL,,,, | SWASTIK TRADERS | 5718795 | 100 % Done | Phansidewa | Completed |
Beautification near Rathhola Sporting Club at Ward No. 22 under SMC, Siliguri |
086/Engg/2020-21(Off-Line) | BEAUTIFICATION,,,, | M/S Ghosh & Sarkar Construction | 491863 | 100 % Done | On Going | |
Installation of 01 (one) nos. Mini High Mast at Ranir Haat More, Churabander |
043/ Engg / Elect / 2020 - 21 / SJDA | Electrical,,,, | M/s Raj Enterprise | 484058 | 100 % Done | Mayanaguri | On Going |
Construction of Cement Concrete Road Starting Along With Guard Wall At Joytir |
e-NIT-172/Engg/2018-2019 | ROAD,,,, | J. K. Construction | 11408270 | 100 % Done | On Going | |
Construction of Auditorium, Office Cum Library and Folk Cultural Center (GF a |
023/2020-2021 | BUILDING,,,, | BINOY ROY | 5182590 | 100 % Done | On Going | |
Construction of road, drain and 6 nos. culvert from the house of Mr. K. P. Da |
006/2020-2021 e-1st Call | Road & Drain Work,,,, | Santosh Das | 3273239 | 100 % Done | Rajganj | Completed |
Beautification Work near Pradhan Building and infront of Agragami Sangha Cric |
NIT-079/ENGG/2020-2021 | BEAUTIFICATION,,,, | Realms Solutions | 499518 | 100 % Done | Completed | |
Supplying and Installation of 01 (One) No. High Mast at Moulani Haat, P.S. †|
137/Engg/Elect/2020-21/SJDA (2nd Call) | Electrical,,,, | M/s Raj Enterprise | 483998 | 0 % Done | Mal | On Going |
Construction of Bituminous Road with two side Drain & culvert at Panchkolguri |
075/ENGG/2020-21 | Development Work,,,, | Fescon | 9621434 | 35 % Done | Rajganj | On Going |
Construction of Bituminous Road with two side Drain & culvert at Haripur Nich |
087/Engg/2020-2021 | ROAD,,,, | Fescon | 9706506 | 50 % Done | Rajganj | On Going |
Strengthening of Road from Sani Mandir to Gourio Math via Biswa Bangla Sports |
032/2021-22 | ROAD,,,, | M P SITANI AND SONS | 6446190 | 0 % Done | On Going | |
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P |
099/Engg/2020-2021 | Development Work,,,, | Ghanashyam Sarkar | 8266223 | 80 % Done | Rajganj | On Going |
Construction of road From Payel More to Ektiasal Hut via Iscon Mandir via Pra |
063/2020-2021 | ROAD,,,,, | M/S Dolphin Construction Co. | 4476047 | 100 % Done | Completed | |
Repair of Mastic road starting from HO Kalyan Das to HO Sarathi Das at ward n |
095/Engg/2020-2021 | ROAD,,,, | Uttam Enterprise | 3171116 | 0 % Done | On Going | |
Beautification of Krishnamaya School gate at Ward No. 12 under SMC, Siliguri |
078/Engg/ /2020-21 (Off-Line) | BEAUTIFICATION,,,, | ABHIJIT DAS | 499026 | 100 % Done | Completed | |
Construction of High Drain from Gowala Patty Manager Jadav House to Mahananda |
001/2021-22 | DRAIN,,,, | Indrajit Sengupta | 6016476 | 0 % Done | On Going | |
Construction of Bituminous Road with two side Drain & culvert at Jamurivita(P |
077/ENGG/2020-2021 | Development Work,,,, | M/S Dolphin Construction Co. | 8266223 | 80 % Done | Rajganj | On Going |
Construction of 3 Cell RCC Box Culvert at Nandanpur, Boalmari(Banskunthia) un |
134/Engg/2020-21 | Culvert,,,, | JOY LAXMI CONSTRUCTION | 8054674 | 0 % Done | Sadar | On Going |
Repairing of Road Starting from Garage of Surya Mallik to Bakery via H/o Ujja |
062/2020-2021 | ROAD,,,, | BIMAN CHAKRABORTY | 5459733 | 0 % Done | Rajganj | On Going |
Construction of Bituminous Road with Drain at Ramnagar Mazdur Basti under Ful |
81/Engg/2020-2021 | Development Work,,,, | R. S. CONSTRUCTION | 9659497 | 70 % Done | Rajganj | On Going |
Construction of Pucca Road with Guard wall starting from Main canal to Masjid |
088/Engg/2020-2021 | ROAD,,,, | The Hindusthan Coop Lab. Cont. & Const. Soc. Ltd. | 9629839 | 80 % Done | Rajganj | On Going |
Construction of High Drain from Dr Malakar Shop to house of N. B. Sarki at Ra |
082/ENGG/2020-2021 | DRAIN,,,, | M/S BAPI DAS | 9132419 | 100 % Done | Rajganj | On Going |
Construction of Water Supply Scheme at Rani Khola Line at Rangamati T. E., Ma |
003/2021-22 | WATER SUPPLY,,,, | PRASENJIT BASAK | 5840736 | 0 % Done | Mal | On Going |
Construction of Drainage with CC Path from the Shop of Majumder Gas Stove Hou |
156/Engg/2020-2021(Offline) (2nd Call) | Road & Drain Work,,,, | SABHA CONSTRUCTION | 499816 | 100 % Done | On Going | |
Construction of Market Complex (G.F. & F.F. Phase-I) near Jalpesh Temple, May |
105/Engg/2020-2021 | BUILDING,,,, | MAA TARA LAB CO-OP CONST . CO. LTD | 19357502 | 0 % Done | Mayanaguri | On Going |
Construction of Market Complex ( G.F , F.F , Fish Shop & Toilet Block Phase-2 |
135/Engg/2020-21 | BUILDING,,,, | MAA TARA LABOUR CO-OPERATIVE CONTRACT AND CONSTRUCTION SOC LTD | 14856367 | 0 % Done | Mayanaguri | On Going |
Restoration of piller of joint Bridge over river Rakti at Fulbari pattern und |
06/de/smp/2020-2021 | Development Work,,,, | Debashis Basak | 4406727 | 0 % Done | Matigara | Completed |
Roof protection work for Shahid Bhagat Singh Market Complex, Sevoke Road, Sil |
050/2020-2021 | BUILDING,,,, | M/s Sakar Enterprise | 2948697 | 0 % Done | Completed | |
Reconstruction Work at part of Fulbari-Ghosh Pukur By Pass ahead from Fulbari |
058/2020-2021 | ROAD,,,, | SARFORAJ CHAUDHURY | 18924958 | 0 % Done | Rajganj | Completed |
Construction of Road Starting form Naresh More via Chika More to Fokdoibari B |
072/ENGG/2020-21 | ROAD,,,, | SUBRATA GHOSH | 7319107 | 0 % Done | Rajganj | On Going |
Construction of Road Starting form Naresh More via Chika More to Fokdoibari B |
073/ENGG/2020-21 | ROAD,,,, | PARTHA BISWAS AND COMPANY | 7319107 | 0 % Done | Rajganj | On Going |
Beautification near Rathhola Sporting Club at Ward No. 22 under SMC, Siliguri |
086/Engg/2020-21(Off-Line) | BEAUTIFICATION,,,, | M/S Ghosh & Sarkar Construction | 491863 | 0 % Done | On Going | |
Construction of Bituminous Road with two side Drain & culvert at Panchkolguri |
074/ENGG/2020-21 | Development Work,,,, | S. R. CONSTN. CO | 9621434 | 0 % Done | Rajganj | On Going |
Installation of 01 (one) nos. Mini High Mast at Ranir Haat More, Churabander |
043/Engg/Elect/2020 - 21/SJDA | Electrical,,,, | M/s Raj Enterprise | 484058 | 0 % Done | Mayanaguri | On Going |
Construction of road and one side drain from house of Gopal Halder to Majhaba |
009/2020-2021 e-1st Call | Road & Drain Work,,,, | ACE CONSTRUCTION COMPANY | 8355507 | 100 % Done | Rajganj | Completed |
Construction of Haat Shade for Fish and Meat Shop at Talma Hat, Sadar Block |
076/2019-20 | BUILDING,,,, | MAA TARA LAB CO-OP CONST . CO. LTD | 6900793 | 0 % Done | Sadar | Completed |
Strengthening of Road at Sagina Mahato Road at Ward No. 18, under SMC, Siligu |
151/ENGG/2018-2019 | ROAD,,,, | M/S ARUN CHANDRA SARKAR & SONS | 4293933 | 100 % Done | On Going | |
Construction of Open Stage With Steel Truss Shade at Jalpesh Mela Ground, Mad |
e-NIT-070/Engg/2019-2020 | BUILDING,,,, | Priya Bhushan Dey | 12086584 | 100 % Done | Mayanaguri | Completed |
Construction of 4 nos Community Toilet at Paswan Busty, Ward No-43 of SMC, Di |
026/ENGG/2020-2021 | Development Work,,,, | SUBRATA GHOSH | 1156191 | 0 % Done | On Going | |
Strengthening of Ganganagar Main Road and Mouni Baba Road at Ward No 5, under |
e-NIT-167/Engg/2018-2019 | ROAD,,,, | Santosh Das | 5285010 | 100 % Done | Completed | |
Construction of Road, Drainage System with Guard Wall Lanes and Bye Lane at T |
050/2019-20 | Development Work,,,, | SUMAN ROY | 16098912 | 0 % Done | On Going | |
Construction of Pucca Road From Magura More to Balason River at Bidhan Nagar, |
069/2019-20 | ROAD,,,, | SOMDEEP GUHA | 11524780 | 0 % Done | Phansidewa | Completed |
Construction of Road and Drain from Netaji Bazar to Jermels Academy School at |
046/2019-20 | Development Work,,,, | NITAI SARKAR | 19410018 | 0 % Done | Rajganj | Completed |
Construction of Mastic Road for Mangal Pandey Sarani and 1st, 2nd, 3rd By Lan |
159/2018-19 | ROAD,,,, | D G CONSTRUCTION | 2711857 | 0 % Done | Completed | |
Construction of Mastic Road of Atul Prasad Sarani and By Lane Dudh More Sani |
158/2018-19 | ROAD,,,, | M P SITANI AND SONS | 1479934 | 0 % Done | Completed | |
Construction of Road and Drain from Nabin Sangha Club O Pathagar to Mandal Gh |
041/2019-20 e-4th Call | Road & Drain Work,,,, | HARKUMAR BARMAN | 5980919 | 0 % Done | Sadar | Completed |
Auditorium (500 Seat) in the Campus of Ekalavya Model Residential School (EM |
138/2018-19 | BUILDING,,,, | M/s Sakar Enterprise | 28776556 | 0 % Done | Mal | On Going |
Environment Friendly Nature Park at Lataguri, Dist. Jalpaiguri. |
068/2018-19 | BEAUTIFICATION,,,, | GOURI CONSTRUCTION | 91792079 | 0 % Done | Mal | On Going |
Construction of G+3 STORIED GUEST HOUSE AT HIMANCHAL VIHAR, PHASE- II, MATIGA |
143/2017-18 e- 2nd Call | BUILDING,,,, | M P SITANI AND SONS | 56652518 | 0 % Done | Matigara | On Going |
Remaining works of main Institute Building including Sanitary & Plumbin |
017/2015 16 2nd Re-e-Tender | BUILDING,,,, | M/s Nanu Shome & Co. | 8006460 | 0 % Done | Rajganj | On Going |